Commissioning

N 26° 05' W 80° 09'

Mast is Stepped

July 13, 2008

The mast was stepped on July 13.  Looks great.  Ground tackle being installed.  The electronics/nav equipment should arrive in the next day or two and then the real mess begins with running all the wires, putting on all the antenna, etc.

view comments (2) add comment