Commissioning
N 26° 05'
W 80° 09'
Mast is Stepped
July 13, 2008
The mast was stepped on July 13. Looks great. Ground tackle being installed. The electronics/nav equipment should arrive in the next day or two and then the real mess begins with running all the wires, putting on all the antenna, etc.
